Previous Projects

Previous Projects

Fayha Projects (1991-2000)

Al-Fayha has undertaken various major construction projects in both public and private sectors in accordance with international standard  and under the direct supervision of our own structural engineering team.

Examples of some projects  that were implemented by the company

  • Al-Garmah Bridge Re-building Project in Basrah in 1991.
  • Abu Al-Khasiab Cooling Tower Project, south of Iraq in 2000.
  • Umm – Qasr Port Passenger Terminal Complex.

 Fayha Projects (2000-2010)

#Main Contractor CompanyProject Name & Location -Performed WorkFrom / To Year
1MO High EducationTechnical Institute Project. At Qurna Manufacturing and Supply of Boundary wall “Columns & Panels”Mar.2015 till
Jul. 2015
2
Eni -Iraq B.V.
Al-Zubair Gas Power Plant (ZGPP) at South Rumaila
Manufacturing of T-Walls (Height-3.66)m 3,500pcs
Mar.2015 till
Feb.2016
3
Eni -Iraq B.V.
EPC for HV Power Transmission System Hammar Mishrif Substation
Supply & Installation of Precast Piles
(40x40)Cm

Feb 2015 till
Dec. 2015
4
MO Oil
Natural Gas Plant Project At Missan
Supply & Installation of Precast Piles
(30x30)Cm
Feb 2015 till
Mar.2015
5China Geo-Engineering Corporation International Ltd.New CPF Project at Missan Oil Field.
Supply & Installation of Precast Piles(30x30) & ( 40x40 )Cm
Feb. 2015 till
Mar. 2015

6Habtoor Leighton Group Co. (HLG )Um Qasr JETTY 3 Gas Exporting Port Terminal
Manufacturing & Delivery of Precast Concrete Slab Decks
May 2015 till
Nov. 2015

7
Iraqi Arab Contractors
Basra Water Supply Improvement (BWSI) Project at Hartha
Supply & Installation of Precast Piles(30x30) (40x40)Cm
Oct.2015 till
June 2016
8China Geo-Engineering Corporation International Ltd.New CPF Project at Missan Oil Field.
Supply & Installation of Precast Piles(30x30) & ( 40x40 )Cm
Feb. 2015 till
Mar. 2015

9Habtoor Leighton Group Co. (HLG )Um Qasr JETTY 3 Gas Exporting Port Terminal
Manufacturing & Delivery of Precast Concrete Slab Decks
May 2015 till
Nov. 2015

10
Iraqi Arab Contractors
Basra Water Supply Improvement (BWSI) Project at Hartha
Supply & Installation of Precast Piles(30x30) (40x40)Cm
Oct.2015 till
June 2016
11Exxon Mobile /CPECCfoundation of tanks
at WQ1 DS6 & DS8
Supply of dry RMC
Dec. 2015 till
Aug 2017
12 METAS Co.Over Head Line Transformation project
RMC Supply & Pumping
Dec. 2015 till
Sept. 2016
13MO IndustryNitrogen Road At Petrochemicals
Supply Of RMC
Delivery And Pump
July 2015 till
Aug. 2015
14SKA Holding Co. & Chemi- Tech Co. Khor Al-Zubeir Free Zone Authority Kafza-Ii Project
Supply Of RMV
Delivery And Pump
Oct. 2015 till
Dec. 2016
15
BP Iraq NV.
Extension of Oil Pipelines Project at South & North Rumaila.
Manufacturing & Delivery of Precast Pipe Sleepers at Rumaila.
June 2013 till
June 2016
16
MO High Education
Abu-Al-khaseeb Univ. Construction Project. Basra, Iraq
Supply & Installation of Precast Piles (30x30)Cm
Aug. 2014 till
Feb. 2015
17
MO Education
Construction of 26 Schools Project at Basra, Samawa & Ammara.
Manufacturing of Precast Wall Panels, Beams, Hollow Core Slaps & Stairs.
Jan.2014 till
Jan.2015
18Arab Contractors Co.-
Egypt
Basra Water Supply Improvement Project (BWSI) Project- at Basra.
Supply & Installation of Precast Piles (30x30)Cm
Feb. 2016 till
August 2018
19Shell Iraq Petroleum Dev. B.V.FCP GAS – SIPD1156 PRECAST PILES
Supply, Delivery of Precast Piles (40x40)Cm
Dec. 2014 till
Feb.2015
20
SKA Energy Holdings Co. Ltd.
Construction of Storage Tanks Project, At Khor Al-Zubeir Free Zone Authority.
Procurement and Construction of Cast in situ Pile Foundation for Diesel Storage Tanks.
Nov.2014 till
Apr. 2015
21ChemiTech Co. LLCCivil Works Project
At Khor Al-Zubeir Free Zone Authority
Excavation & backfilling; concrete works; Earth Pit Hole drilling, water stop HDPE works; internal roads, road crossings, construction of Pump Shed
Oct. 2015 till
March 2016.
22HDGSK Unincorporated JV.Karbala Refinery Project at Karbala.
Engineering, Procurement, Supply & Constriction of Test Bored Pile.
May 2014 till
Aug 2014
23Samsung Engineering Co. Ltd.New DGS Project at Zubair Oil Filed Dev. North-Zubeir.
Manufacturing, Delivery & Installation of Precast Concrete Piles ( 40x40)Cm
Sept 2014 till
April 2015
24MO MunicipalityHey Sewage Station–Al-Kut Governorate.
Supply PC Piles (30x30) Cm
Jan.2014 till
Nov. 2014
25China Petroleum Pipeline (CPPEPCC FOR Missan Oil Export Pipeline (MOEP), at FAO. (BVS 13, BVS 14) and FAO Station.

Supply PC Piles (30x30) Cm
Mar. 2014 till
May 2014
26

ENKA TEKNIK
Najybia Gas Turbine Power Plant Project 4X125MW 9E GE
Manufacture and installation Of Boundary Wall
Feb 2013 till
Aug 2013
27Lukoil Mid-East Co.WQ2 Line Transmission of 255 Tower
Supply PC Piles (30x30) Cm
April 2013 till
June 2013
28STX Heavy Industrial Co.Al-Amara Gas Turbine Power Plant Project 4X125 MW 9E
Supply PC Piles (40x40) Cm
Nov. 2013 till
Feb. 2014
29British Petroleum -
ROO
Rumaila South & North Pipe Line Project
Supply of Precast Pipe
Sleepers
June 2013 till
June 2015
30Anhui Arabest General Construction LLC.Abu Al-Khaseeb 200 beds Hospital
Supply PC Piles (40x40)Cm
Oct. 2013 till
Jan. 2014

31Saipem-Sajer IraqWQ1 DS7 OSBL Water Pipe Line Inject System
Manufacturing of Pipe
Supports
July 2013 till
June 2014
32(CGC) China Geo Engineering Coope. Int'l Co. LtdAl-Amara province Sewage Station
Supply Piles (30x30)Cm
Feb. 2013 till
June 2013
33Lukoil Mid- East Co.WQ2 Oil Field (Phase II)
Supply & Test Piles (30x30) Cm
April 2012 till
Feb 2013
34Shapoorji Mid-East LLCShat Al-Arab Hotel Construction Project.
Supply & Test Piles (30x30) Cm
Oct 2012 till
Feb 2013

35Enka Construction Ltd.GPP Plant / WQ 2 Oil Field
Supply & Test Piles (35x35) Cm
June 2012 till
Dec 2012