Previous Projects
Fayha Projects (1991-2000)
Al-Fayha has undertaken various major construction projects in both public and private sectors in accordance with international standard and under the direct supervision of our own structural engineering team.
Examples of some projects that were implemented by the company
- Al-Garmah Bridge Re-building Project in Basrah in 1991.
- Abu Al-Khasiab Cooling Tower Project, south of Iraq in 2000.
- Umm – Qasr Port Passenger Terminal Complex.
Fayha Projects (2000-2010)
# | Main Contractor Company | Project Name & Location -Performed Work | From / To Year |
---|---|---|---|
1 | MO High Education | Technical Institute Project. At Qurna Manufacturing and Supply of Boundary wall “Columns & Panels” | Mar.2015 till Jul. 2015 |
2 | Eni -Iraq B.V. | Al-Zubair Gas Power Plant (ZGPP) at South Rumaila Manufacturing of T-Walls (Height-3.66)m 3,500pcs | Mar.2015 till Feb.2016 |
3 | Eni -Iraq B.V. | EPC for HV Power Transmission System Hammar Mishrif Substation Supply & Installation of Precast Piles (40x40)Cm | Feb 2015 till Dec. 2015 |
4 | MO Oil | Natural Gas Plant Project At Missan Supply & Installation of Precast Piles (30x30)Cm | Feb 2015 till Mar.2015 |
5 | China Geo-Engineering Corporation International Ltd. | New CPF Project at Missan Oil Field. Supply & Installation of Precast Piles(30x30) & ( 40x40 )Cm | Feb. 2015 till Mar. 2015 |
6 | Habtoor Leighton Group Co. (HLG ) | Um Qasr JETTY 3 Gas Exporting Port Terminal Manufacturing & Delivery of Precast Concrete Slab Decks | May 2015 till Nov. 2015 |
7 | Iraqi Arab Contractors | Basra Water Supply Improvement (BWSI) Project at Hartha Supply & Installation of Precast Piles(30x30) (40x40)Cm | Oct.2015 till June 2016 |
8 | China Geo-Engineering Corporation International Ltd. | New CPF Project at Missan Oil Field. Supply & Installation of Precast Piles(30x30) & ( 40x40 )Cm | Feb. 2015 till Mar. 2015 |
9 | Habtoor Leighton Group Co. (HLG ) | Um Qasr JETTY 3 Gas Exporting Port Terminal Manufacturing & Delivery of Precast Concrete Slab Decks | May 2015 till Nov. 2015 |
10 | Iraqi Arab Contractors | Basra Water Supply Improvement (BWSI) Project at Hartha Supply & Installation of Precast Piles(30x30) (40x40)Cm | Oct.2015 till June 2016 |
11 | Exxon Mobile /CPECC | foundation of tanks at WQ1 DS6 & DS8 Supply of dry RMC | Dec. 2015 till Aug 2017 |
12 | METAS Co. | Over Head Line Transformation project RMC Supply & Pumping | Dec. 2015 till Sept. 2016 |
13 | MO Industry | Nitrogen Road At Petrochemicals Supply Of RMC Delivery And Pump | July 2015 till Aug. 2015 |
14 | SKA Holding Co. & Chemi- Tech Co. | Khor Al-Zubeir Free Zone Authority Kafza-Ii Project Supply Of RMV Delivery And Pump | Oct. 2015 till Dec. 2016 |
15 | BP Iraq NV. | Extension of Oil Pipelines Project at South & North Rumaila. Manufacturing & Delivery of Precast Pipe Sleepers at Rumaila. | June 2013 till June 2016 |
16 | MO High Education | Abu-Al-khaseeb Univ. Construction Project. Basra, Iraq Supply & Installation of Precast Piles (30x30)Cm | Aug. 2014 till Feb. 2015 |
17 | MO Education | Construction of 26 Schools Project at Basra, Samawa & Ammara. Manufacturing of Precast Wall Panels, Beams, Hollow Core Slaps & Stairs. | Jan.2014 till Jan.2015 |
18 | Arab Contractors Co.- Egypt | Basra Water Supply Improvement Project (BWSI) Project- at Basra. Supply & Installation of Precast Piles (30x30)Cm | Feb. 2016 till August 2018 |
19 | Shell Iraq Petroleum Dev. B.V. | FCP GAS – SIPD1156 PRECAST PILES Supply, Delivery of Precast Piles (40x40)Cm | Dec. 2014 till Feb.2015 |
20 | SKA Energy Holdings Co. Ltd. | Construction of Storage Tanks Project, At Khor Al-Zubeir Free Zone Authority. Procurement and Construction of Cast in situ Pile Foundation for Diesel Storage Tanks. | Nov.2014 till Apr. 2015 |
21 | ChemiTech Co. LLC | Civil Works Project At Khor Al-Zubeir Free Zone Authority Excavation & backfilling; concrete works; Earth Pit Hole drilling, water stop HDPE works; internal roads, road crossings, construction of Pump Shed | Oct. 2015 till March 2016. |
22 | HDGSK Unincorporated JV. | Karbala Refinery Project at Karbala. Engineering, Procurement, Supply & Constriction of Test Bored Pile. | May 2014 till Aug 2014 |
23 | Samsung Engineering Co. Ltd. | New DGS Project at Zubair Oil Filed Dev. North-Zubeir. Manufacturing, Delivery & Installation of Precast Concrete Piles ( 40x40)Cm | Sept 2014 till April 2015 |
24 | MO Municipality | Hey Sewage Station–Al-Kut Governorate. Supply PC Piles (30x30) Cm | Jan.2014 till Nov. 2014 |
25 | China Petroleum Pipeline (CPP | EPCC FOR Missan Oil Export Pipeline (MOEP), at FAO. (BVS 13, BVS 14) and FAO Station. Supply PC Piles (30x30) Cm | Mar. 2014 till May 2014 |
26 | ENKA TEKNIK | Najybia Gas Turbine Power Plant Project 4X125MW 9E GE Manufacture and installation Of Boundary Wall | Feb 2013 till Aug 2013 |
27 | Lukoil Mid-East Co. | WQ2 Line Transmission of 255 Tower Supply PC Piles (30x30) Cm | April 2013 till June 2013 |
28 | STX Heavy Industrial Co. | Al-Amara Gas Turbine Power Plant Project 4X125 MW 9E Supply PC Piles (40x40) Cm | Nov. 2013 till Feb. 2014 |
29 | British Petroleum - ROO | Rumaila South & North Pipe Line Project Supply of Precast Pipe Sleepers | June 2013 till June 2015 |
30 | Anhui Arabest General Construction LLC. | Abu Al-Khaseeb 200 beds Hospital Supply PC Piles (40x40)Cm | Oct. 2013 till Jan. 2014 |
31 | Saipem-Sajer Iraq | WQ1 DS7 OSBL Water Pipe Line Inject System Manufacturing of Pipe Supports | July 2013 till June 2014 |
32 | (CGC) China Geo Engineering Coope. Int'l Co. Ltd | Al-Amara province Sewage Station Supply Piles (30x30)Cm | Feb. 2013 till June 2013 |
33 | Lukoil Mid- East Co. | WQ2 Oil Field (Phase II) Supply & Test Piles (30x30) Cm | April 2012 till Feb 2013 |
34 | Shapoorji Mid-East LLC | Shat Al-Arab Hotel Construction Project. Supply & Test Piles (30x30) Cm | Oct 2012 till Feb 2013 |
35 | Enka Construction Ltd. | GPP Plant / WQ 2 Oil Field Supply & Test Piles (35x35) Cm | June 2012 till Dec 2012 |