A)  KAFZA-II FOR OIL STORGE TERMINAL / EPC PROJECT.

Client                      : SKA Energy Holding Co. Ltd.            

Project Name       : Oil Storage Terminal_ KafzaII  

Sub-Contractor    : Al-Fayha Precast Company Ltd

Date of Contract  : 10th June.  2015

Completion Date  : 10th Dec.  2015

Location                : Khor Al-Zubair, Al-Basra, Iraq  At Free zone  

Scope of Work      : Procurements & Construction Of Cast in Situ Pile  Foundation For Storage

                                 Tanks at Kafza-II, Iraq 

 

 

 

 

..................................................................................................................... 

 

 

 B)  Al-Zubair Electrical Power Station Project:

 Client                   : Ministry of Electricity

 

Main Contractor  : SHAMS Al-SABAH Co. Ltd

Sub-Contractor    : Al-FAYHA PRECAST Co. Ltd.

Contract Date      : 8th Jan., 2015

Completion Date  : 26th April; 2015

Location               : Al-Basra – Al-Rumaila

Scope of Work      : Manufacturing of Precast T-walls to Supply (3,500 Pieces), for Security Fence. 

 

 

 

 

......................................................................................................................



 

C)  China Geo-Engineering Ltd. / CGC IN IRAQ

Client                       : Ministry of Oil.

Main Contractor        : Nature Gas Plant Project in Missan

Sub-Contractor          : Al-Fayha Precast Company Ltd

Date of Contract        : 10th  May, 2015

Completion Date        : 20th June, 2015

Location                      : Missan-Iraq

Scope of Work             : Manufacturing, Transportation and   Installation of Precast Piles.  


 

 

..................................................................................................................

 

D  ) Iraq Crude Oil Export & Expansion Project (ICOEEP) at Fao Island:

Client              : South Oil Company (SOC)

Consultant        : Foster Wheeler

Main Contractor  : Leighton Offshore

Sub-Contractor    : Una E&C

Completion Date  : 30th June 2012

Location               : Al-Fao Island

Type of Work       : Civil Works                        

Scope : Beach Valve Station (BVS) & Al-Fao Station (Pipeline Works at Fao)                                                                                                                                                                            

This Project is part of the Crude Oil Export Pipe Lines Expansion at Al-Fao. The Project is divided into two Phases: (Phase-I & Phase-II). 

 

 

 

 

CIVIL WORKS FOR BVS :-

·         Earth Works: -

-          Site Clearance and preparation;

-          Site stripping, grading & leveling;

-          Cutting/Filling & Compaction;

-          Dispose of Surplus Materials; Road Access: -

-          Cutting & Filling, Road Marking, Traffic Signs; 

-          Precast Kerbstone impeded on 20mm thickness;

-          Other Civil Works: -

-          Surface & Drainage; Berm & Surface;

-          Fence Works; Gate works & Lighting;

-          Sub-Station, Piling, Gate Valve Foundation;

-          Pipe Supports, Access Platform; HPU Cabinet Shelter; Protection.

 

 


·         CIVIL WORKS FOR FAO SUB-STATION:

·         Earth Works: -

-          Site Clearance and preparation;

-          Site stripping, grading & leveling;

-          Cutting/Filling & Compaction;

-          Dispose of Surplus Materials;

·         Road Access: -

-          Cutting & Filling;

-          Road Marking, Traffic Signs;

-          Precast Kerbstone impeded on 20mm thickness.

                                                           

·               Other Civil Works: -

-          Surface & Drainage;

-          Berm & Surface;

-          Fence Works; Gate works & Lighting

-          Sub-Station, Gate Valve Foundation;

-          Pipe Supports, Piling, Road Crossing;

-   HPU Cabinet Shelter; Access Platform, Protection &Trenching.                                                                                                                                                           

·         Foundation Woks:-

-          Metering Skid Foundation;

-          Metering Skid Shelter Foundation;

-          Metering Skid Installation;

-          Diesel Power Generator Foundation;

-          Pig Launcher & Receiver Pad;

-          Transformer Foundation;

-          Vent Stack Foundation;

-          Instrument Air System;

-          Sampling System Foundation. 

 

 

 

 .............................................................................................

 

D) Shat Al-Arab Hotel Construction at Shat Al-Arab River (Presidential Palace 

Client             : Basra Governorate

Main Contractor  : Shapoorji Pallonji Mid-East Co.

Sub-Contractor    : Al-Fayha Precast Company Ltd

Completion Date  :

Location          : Shatt Al-Arab

Type of Work     : Design & Built (Turn Key), Shatt Al-Arab Hotel Project                  

Scope             : Test, Supply & Installation of  Precast Piles.  

Al-Fayha is Subcontractor for the execution of Test, Supply and Installation of Precast Piles for the hotel.

The Test of Piles was executed by Al-Fayha through its Subsidiary Co. Al-Watania for Engineering and Contracting Co. Ltd. 

Pile Tests include; (PDA, Compression, Tension and Lateral Tests), of which Certified Reports are issued.

 


 

...................................................................

 

F)  WQ - 2 DEVELOPMENT PROJECT :

Client                   : LukOil Mid-East Co. Ltd

Consultant           :

Main Contractor  : Samsung Engineering Co. Ltd

Sub-Contractor    : Al-Fayha Precast Company Ltd

Contract Date      : 4th April 2012

Completion Date  : 25th March 2013

Location               : SWQ-2

Type of Work       : Commercial Production of  400KBPD at WQ- II                                    

Scope                   : Test, Supply & Installation of Precast Piles    

in this Project, due to excellent performance of the Project, Al-Fayha was awarded Certificate of Appreciation.

Please refer in the appendix of the Awarded Certificates. 

 

 

..................................................................

 

H)  CONSTRUCTION OF POWER PLANT PROJECT AT WQ- 2:

Client                   : LukOil Mid-East Co. Ltd

Main Contractor  : ENKA Insaat Ve Sanayi A.S

Sub-Contractor    : Al-Fayha Precast Company Ltd

Date of Contract  : 31st May 2012

Completion Date  : 30th March 2013

Location               : WQ-2

Type of Work       : EPC of 3 X 42MW GTPP     

Scope                   : Test, Supply & Installation of  Precast Concrete Piles.  

 

 

 

 

 

 

 

.............................................................................

 

 

I)  AL- Najybia 4x125MW 9E GE Gas Turbine Power Plant Project:

Client                   : Ministry of Electricity

Main Contractor  : ENKA TEKNIK for General  Contracting & Maintenance

Sub-Contractor    : Al-Fayha Precast Company Ltd

Date of Contract  : 5th February 2013

Completion Date  :

Location               : Al-Najybia Power Plant Project

Type of Work       : 4 x125MW 9E GE Gas Turbine       

Scope                   : Supply & Installation of Precast Fence.   

 

 

 