Latest Projects..

 

  Precast Concrete Elements Manufacturing and Installation Projects for 2019

 

SR#

Client

Main Contractor Company

Project Name & Location

 

Performed Work

From / To Year

 

1

IRAQ PORTS AUTHORITY

(GCPI)

 

CALIK ENERGY CO.

Rehabilitation of Ports Berth

( Khor Al-Zubeir &

Um Qassr Ports)

Fabrication and Installation of Precast Concrete Piles

(300mm x 300mm)12ML +

(400mm X400mm)12ML

 

October 2019

Until now

 

2

 

IRAQ PORTS AUTHORITY (GCPI)

 

CALIK ENERGY CO.

Rehabilitation of Ports Berth

( Khor Al-Zubeir &

Um Qassr Ports)

Provision of RMC Supply and Pumping Services

May 2019

Until now

3

IRAQ PORTS AUTHORITY

(GCPI)

CALIK ENERGY CO.

Rehabilitation of Ports Berth

( Khor Al-Zubeir &

Um Qassr Ports)

Fabrication and Installation of Precast Concrete Girders

June 2019

Until  now

4

 

SCOP

State Co. for Oil Projects (SCOP)

Construction of New Tanks Foundation for Oil Products Storage at Buzurgan, Ammara.

RMC Supply of various grades:

(C-25 & C-30) Compressive strength, with Pumping Services.

 

 

June 2019

Until now

5

 

OPDC

Oil Products Distribution Co.

(OPDC)

Boundary Fence Construction for OPDC Warehouses at Ammara, Missan

Fabrication of Precast Concrete Fence, delivery and installation.

Oct. 2019

Until now.

6

 

BGC

Iraq Gates Contracting Co. (IGCC)

Oil Storage Tanks Maintenance for Um Qasr + KZP & DGS Hemmar Al-Mishrif

Provision of RMC Supply and Pumping Services

Oct. 2019

until now

   

   Precast Concrete Elements Manufacturing and Installation Projects for 2018

 

SR#

Client

Main Contractor Company

Project Name & Location

 

Performed Work

 

From / To Year

 

1

 

MOE

 

ElSwedi Electric PSP

Iraq 4 Substations Power Plants 400kv/132kv Secondary Substations, Missan-Iraq

Fabrication and Erection of Boundary Wall

Feb. 2018 till

April 2018

 

2

 

 

MOE

 

ElSwedi Electric PSP

Iraq 4 Substations Power Plants 400kv/132kv Secondary Substations, Missan-Iraq

Fabrication and Installation of Precast Concrete Piles

(285 x 285 x 12)ML

 

April 2018 till now

 

3

Min. Of Municipality

Pro-technique for multi projects

Basra Water Supply Improvement

(BWSIP)

Fabrication and Installation of Precast Concrete Piles

(300 x 300 x 12)ML

 

April 2018 till now

 

4

 

SCOP

 

Progetti Europa & Global S.p.A.

 

 

4  Turbo Pumps Station in FAW

Fabrication and Installation of Precast Concrete Test Piles

(400 x 400 x 12)ML

 

May 2018 till now 2018

 

5

 

Exxon Mobil

 

Soor Al-Basra for Gen. Contracting Co.

 

Overhead Power Transmittal Line

WQ-1

Fabrication and Installation of Precast Concrete Piles

(400 x 400 x)12ML

 

March 2018 till Sept. 2018

 

6

 

LUKOIL

 

MSK GROUP

 

Overhead power transmission Line

WQ-2

Fabrication and Installation of Precast Concrete Piles

(300 x 300 x)12ML

 

April 2018

till Dec.2018

 

 

  RMC Supply & Precast Concrete Elements Manufacturing and Installation Projects for 2017

SR#

Client

Main Contractor

Company

Project Name & Location

Performed Work

 

From / To Year

 

1

South Oil Refinery

Shuaiba Oil Refinery .

Construction of New Oil Refinery Unit at South Oil Refinery

Basra-Iraq

Manufacturing, delivery and  installation of Precast Concrete Piles (35X35cm) for the Project.

 

Nov. 2016 – till March 2017

 

2

 

 

Kuwait Energy

 

Petrojet

Design and Construction of Water Intake System Project/ CPF Station, at Siba Oil Field Dev.

Basra-Iraq

Construction of Pumping Station for Water at an Average of 55M3/hr  Approx. 70ML Depth at Shat Al-Arab River.

 

June. 2017 till

March 2018

 

3

 

South Oil Refinery

 

Shuaiba Oil Refinery .

Construction of New Oil Refinery Unit at South Oil Refinery

Basra-Iraq

Provision of RMC Supply of various grades (C-35) Compressive Strength, Delivery and Pumping Services.

 

Feb. 2017 till

April 2018

 

4

 

MOE

 

Local Co.,

Construction of Ozer Mobile Electrical Station Project.

Basra-Iraq

Fabrication of Precast Concrete T-Walls Dim.(3.65X1.4X03)M.

Jan. 2017 till

Aug 2017

 

5

 

Exxon Mobil

Enka Construction Turkish Co.

IOT Project at (DS-8)

WQ-1 Hammer Mishrif

Supply & Pumping of RMC & PC.T-Walls, Jersey Barriers, U-Culvert & PC blocks “spacers”

March 2017 till

May 2017

 

6

 

MOE

 

Local Co.

Foundation for Over Headline Electrical Power Transmission Project at Hartha.

Fabrication of Precast Piles

(35 X 35 X 12)ML

Sept. 2017 till

Dec. 2017


 

 

 


SR#

Client

Main Contractor /

Company

Project Name & Location

Performed Work

 

From / To Year

 

7

 

MOE

 

Especial Energy Co.

Construction of Electrical

Transmission Line Foundation Project,  Basra-Iraq

Fabrication of various P. Concrete Trenches for Electrical Cables. Dim. (800X800X700 )mm

Aug. 2018 till   Dec. 2018

 

8

 

 

ENI-IRAQ

B.V.  CO.

 

ALASTOM/ Shams Al-Sabah

 

Al-Zubeir Permanent Power Generation (ZPPG)

Fabrication of various Precast Concrete Units: Pipe Sleepers, Trenches, Pull Pits (Oily & Non- Oily Water Pits/ Sewage Pits) and Electrical Light Pole foundations.

 

Nov. 2017 till  July 2018

 

9

OPDC

(Oil Products  Distribution Co.)

 

OPDC

Construction of Power Plant Substation at Al-Moftia District, Basra-Iraq

RMC Supply of various grades:

(C-25 & C-30) Compressive strength, with Pumping Services.

 

 

Mar. 2017 till Nov. 2017

 

10

 

BGC

 

BGC

 

Construction of Storage Warehouses Floor.

RMC Supply of various grades:

(C-25 & C-30) Compressive strength, with Pumping Services.

 

 

July 2017 till

Dec. 2017

 

 

11

 

Exxon Mobil / CPECC

 

BAWABAT Al-Rumaila

 

New DGS Station-8

RMC Supply of various grades:

(C-15; C-35 & C-40) Compressive strength, with Pumping Services.

 

 

Jan. 2017 till

Dec. 2017


 

 

 

   - Bored & Precast Piles and Rmc. Supply & Installation Projects 2015-2016

 

SR#

Client

 

Main Contractor /

Company

Project Name & Location

 

Performed Work

 

From / To Year

 

Value of Project

 

1

Kuwait energy

Petrojet Co.

Siba Gas Filed Development Project /Siba- Fao. At Basra-Iraq 

Manufacturing, delivery and  hammering, Precast Concrete Piles (40*40cm) for the Project.

 

11th Jan. 2016 to 30th May. 2016

 

 

$1,914,200

 

2

 

Exxon Mobile

 Enka Co.

WQ-1 (IOT) Initial Oil Train Project at DS-8 Station. At Basra-Iraq.

Manufacturing, delivery and Installation of Precast  Concrete Piles, section (350*350mm) for the Project.

25th July. 2016

to

till Now

 

$1,296,000

3

Exxon Mobile

 AWI Co.

    Al-Waha Housing Complex Project at Energy City Burdjesia, Basra-Iraq

Manufacturing and  Delivery of Precast Concrete Fence (1,500ML) for the project.

22nd Jun. 2016

to

Until Now

 

$306,529.00

4

BP /ROO

Al-Nubala Co.

 Construction of Housing Complex  Project at Al-Mutaiha District in Basra-Iraq

Supply of RMC, Grade C-25 & Delivery for the Project.

13th Feb. 2016

to

1st July, 2016

 

 

$3,937.50

5

SOC

Al-Tadbeer Co.

Iranian

Extension of Gas Pipelines from Abadan-Iran to Basra-Iraq at various locations in Basra, “South Rumaila, Nadhm St. and Shuaba”.

Supply RMC. For Gas Pipeline  Project

Jan. 2016 to Feb. 2016

 

$10,500.00

 

 

 

  A - Bored and Precast Piles Supply and Installation Projects for 2015 

 

Bored & Precast Piles Supply & Installation Projects 2015

SR#

Client

Main Contractor /

Company

Project Name & Location

 

 

Performed Work

 

 

From / To Year

 

1

Ministry of Education

Al-Jazeera  Al-Hamra Co.

Technical Institute Project.  At Qurna

Manufacturing and Supply  of Fence “Columns & Panels”

15th Mar. ; 2015

to

18th Jul.; 2015

2

Eni -Iraq B.V.

Alstom Co. Main Cont. Shams Al-Sabah Sub-Cont.

Al-Zubair Gas Power Plant (ZGPP) at South Rumaila

Manufacturing of T-Walls (Height-3.66)m 3,500pcs

15/01/2015

To 17/01/ 2016

3

Eni -Iraq B.V.

Mitas Energy and Metal Construction INC.

EPC for HV Power Transmission System Hammar Mishrif Substation

Manufacturing, Delivery and Installation of Precast Piles (40X40)cm

28/5/2015

To 29/5/2015

 

4

 

Ministry of Transport

Al-Nukhba  Co.

Construction of 25km Road at Nasiriya  

Manufacturing & Delivery of Precast Girders Length =20m

28th Feb. ;2015

to

15th Mar.; 2015

5

Ministry of Oil

China Geo-Engineering Corporation International Ltd.

Natural Gas Plant Project At Missan

Manufacturing of  Precast Pile (28.5*28.5cm) Length

15th Feb ;2015

to

15th Mar.;2015

6

Ministry of Oil

China Geo-Engineering Corporation International Ltd.

New CPF Project at Missan Oil Field.

Manufacturing Precast Piles, (28.5*28.5 & 40*40 cm Supply & Delivery.

17th Feb.; 2015

to

15th Mar.; 2015

 

 

   B - Bored and Precast Piles Supply and Installation Projects for 2015

 

Bored & Precast Piles Supply & Installation Projects for  2015

SR#

Client

Main Contractor /

Company

Project Name & Location

 

 

Performed Work

 

 

From / To Year

7

Ministry of Transportation

Habtoor Leighton Group Co.

UM QASSR PORT TERMINAL - 3 JETTY PROJECT AT BASRA

Manufacturing & Delivery  of Precast Concrete Slab Decks  at Umm-Qassr.

22-4-2015

To 10-11-2015

 

8

Ministry of Electricity

Hasan Habib

Electricity Cables Foundation Project at Ammara Power Station

Manufacturing and delivery of precast Trenches

12/4/2015

To now

9

State Company of Oil Projects - SCOP

Al-Hajer Al-Aswad Al-Mutahida Co.

Guard Tower Project at

Missan Refinery

Manufacturing, delivery and installation of Guard Towers

19/4/2015

to 2/2/2016

10

Ministry of Municipality

Iraqi Arab Contractors

Basra Water Supply Improvement (BWSI) Project at Hartha


 Manufacturing, Delivery and Installation of Precast Piles, (28.5*28.5) & (40X40)cm

25/10/2015

Till now

11

Ministry of Electricity

The Silver Belt Co.

Electricity Cables Foundation Project at Najybia, Basra.

Manufacturing and delivery of precast Trenches + Covers

12/5/2015

31/12/2015

12

Private sector

Bader Babil Co

Guard Tower Project at Al-Tuba and Nukheil,  Basra

Manufacturing, delivery and installation of Guard towers

15/1/2015

To 19/3/2015


 

  C - Bored and Precast Piles Supply and Installation Projects for 2015

Bored & Precast Piles Supply & Installation Projects for 2015

SR#

Client

Main Contractor /

Company

Project Name & Location

 

 

Performed Work

 

 

From / To Year

13

Private sector

Funoon Al-Rafiden

Guard Towers Project

Re-installation of P.C Guarding Towers at Basra

2/11/2015

To 3/11/2015

14

Private Sector

Adwaar Al-Kawthar

 Construction of Park at Basra

Manufacturing & Delivery

of Water Tanks

16/6/2015

To 1/8/2015

15

Foreign Embassies

Persian Consulate

Fencing Project at Basra

Manufacturing, delivery and installation of T-Walls

26/5/2015

To 15/6/2015

 

16

Private sector

Contractor/ Sayed Abd Al-Kadhim

Water Tanks Project at Basra

Manufacturing & delivery

of Water Tanks

3/2/2015

T0 4/2/2015

C

 

  D -  Supply of Ready Mixed Concrete (RMC) Projects for 2015  

 

Bored & Precast Piles Supply & Installation Projects for 2015

SR#

Client

Main Contractor /

Company

Project Name & Location

 

 

Performed Work

 

 

From / To Year

17

EXXON MOBIL

&

CPECC

 

BAWABAT AL-RUMAILA CO.

 

FOUNDATION OF TANKS

 AT WQ1 DS6 & DS8

SUPPLY OF DRY RMC DELIVERY AND PUMPING

5th OF DEC  2015

UNTIL NOW

18

Eni -Iraq B.V.

Main Contractor

METAS CO.

Subcontractor:

ARDH AL-SHAMAEL

POWER PLANT TRANSFORMATION PROJECT  

SUPPLY OF RMC, DELIVERY AND PUMPING

DECEMBER 2015

UNTIL NOW

19

SGC

AMWAJ AL-FURAT

SOUTH GAS COMPANY 

SUPPLY, DELIVERY AND PUMP OF RMC

MAY  2015

DEC  2015

20

Ministry of Industry

PETROCHEMICALS FACTORY

NITROGEN ROAD AT PETROCHEMICALS  

SUPPLY OF RMC

 DELIVERY AND PUMP  

JULY 2015  –

AUGUST 2015

21

General Authority for Free Zone

SKA HOLDING CO. & CHEMITECH CO.

KHOR AL-ZUBEIR FREE ZONE AUTHORITY KAFZA-II PROJECT

SUPPLY OF RMC

DELIVERY AND PUMP

8TH OCT. 2015

UNTIL NOW

 


 

   E - Bored & Precast Piles Supply and Installation Projects for 2014-2015

SR#

Client

Main Contractor /

Co.

Project Name & Location

Performed Work

 

 

From / To Year

22

BP Iraq NV.

ROO Co.

Extension of Oil Pipelines Project at South & North Rumaila.

Manufacturing & Delivery of Precast Pipe Sleepers at Rumaila.

1st Sept.; 2013  to

1st Sept.; 2016

 

23

Ministry of high Education

Veranda Co.

Abu-Al-khaseeb Unv. Construction Project. Basra, Iraq

Supply, Delivery & Installation of Precast Piles.

11thAug. 2014 to

5th Feb.; 2015

24

Ministry of Education

Al-Edad Co.

Construction of 26 Schools Project at Basra, Samawa & Ammara.

Manufacturing of Precast Wall Panels, Beams, Hollow Core Slaps & Stairs.

 

24th Jan.; 2014 to

20th Jan.; 2015

25

Ministry of Water Resources

Al-Bader Al-Moneer for General Contracting Co.

Construction of Water Tank – (1000)m3 at Shatra District- Nasiriya

Manufacturing & Delivery of Precast Concrete “Panels, Columns and Foundation).

 

16th Oct. 2014 to

28th Dec.; 2015

26

Ministry of water resources

Arab Contractors Co.

Basra Water Supply Improvement Project (BWSI) Project- at Basra.

Manufacturing, Transport, Test & Driving of Precast Piles (40*40)cm-Test pile,36m Depth.

(40*40)cm Test Piles 27m Depth.

10th Jan. 2014 to

10th Sept.;2015

27

SOC

 

Shell Iraq Petroleum  Dev. B.V.

FCP GAS – SIPD1156 PRECAST PILES

Supply, Delivery of Precast Piles.

2nd Dec.; 2014 to

28th Feb.; 2015  

28

SKA Energy  Holdings Co. Ltd.

CHEMITECH Co. LLC

Construction of Storage Tanks Project

At Khor Al-Zubeir Free Zone Authority

 Procurement and Construction of Cast in situ Pile Foundation for Storage Tanks.

 

15th Dec.;  2014 to

15th Apr.;  2015



 

 

F)  Bored & Precast Piles Supply and Installation Projects for 2014-2015

 

 

 

SR#

 

 

 Client

 

 

Main Contractor Co.

 

 

Project Name & Location

 

 

Performed Work

 

 

 

 

 

From / To Year

 

29

Hyundai Co.

HDGSK Unincorporated JV.

Karbala Refinery Project at Karbala.

Engineering, Procurement, Supply & Constriction of Test Bored Pile.

1st may; 2014 to

27th Aug.; 2014

30

Luk Oil Mid-East Co.

Samsung Engineering Co. Ltd.

New DGS Project at Zubair Oil Filed Dev. North-Zubeir.

Manufacturing, Delivery & Installation of Precast Concrete Piles.

6th July; 2014 to

27th Aug.; 2014

31

Privet Sector

A.L.E. Co.

Industrial Site. Basra-Khor Al-Zubair.

Civil Works.

12th Jan.; 2014 to

23rd April; 2014

32

 

Ministry of Youth and Sports

Al-Faris Co.

Sports City/Basra.

Manufacturing H.C.S.

2nd April; 2014 to

5th April; 2014

33

Ministry of Oil

Al-Ratbaa Co.

Guard Tower at Eni Site-Rumaila.

Manufacturing of  Guard towers H-7.5m

17th Jun; 2014 to

18th Jun; 2014

34

Private Sector

AWI-Awael Iraq Co.

Company Location, close to the Petrol Station.

Manufacturing & Delivery of Opened Barrier.

14th May; 2014 to26th July; 2014

35

Ministry of Oil

Habar Al-Qeir Co.

Zubair-Sho’aiba Refinery.

 

Manufacturing Guard Tower H-7.5m

14th Aug.; 2014 to18th Sept.;2014

             

 

F

  G)  Bored & Precast Piles Supply and Installation Projects for 2014

 

SR#

Client

Main Contractor /

Company

Project Name & Location

Performed Work

From / To Year

36

Private Sector

Eng. Belal Hamed

Fence Nissan Motor & Toyota Motor -Basra

Manufacturing, Transport & Installation of Precast Fence.

10th  Ma.; 2014 to

  23rd Aril.; 2014

 

37

Ministry of Electricity

Philadelphia Co.

Al-Hartha Electrical Station-Basra

Test Piles 28.5*28.5

8th May.; 2014 to

  20th May.; 2014

38

Ministry of Internal Affairs  

Habary Al-khair Co.

Emergency Building – Al-Zubeir Basra.

Manufacturing & Delivery of Precast Fence “Panels & Columns”.

19th Mar.; 2014to

13th May; 2014

39

Minister of Industry & Minerals

Al-Benaa Al-Mo’aser Co.

Zubair Oil Field Develop’t Project Basra.

Manufacturing, Transport, Driving &Test of Precast Piles.

6th Jul.; 2014 to

27th Aug.;2014

 

40

 

Ministry of Roads & Bridges.

Bahar Al-Kanooz Co.

Al-Tanoma Bridge-Basra.

Manufacturing Girder L-12m

25th Aug.;2014 to

29th Sept.;2014

41

Private sector

Al-Bena’a Technology Co.

Construction of Camp for Agility  Co. at North Rumaila - Basra

Manufacturing of Guard Tower H-7,5m

8th Jan.; 2014 to

   2nd Aug.; 2014

42

Private sector

Al-Sadeel Co.

Regional Development Project-Missan

 Manufacturing & Delivery of Precast Concrete Structure and Sheds.

20th Jan.; 2014  to

23rd Feb.; 2014

 

 

 H)  Bored & Precast Piles Supply and Installation Projects for 2014

 

SR#

Client

Main Contractor /Co.

Project Name & Location

Performed Work

From / To Year

43

Ministry of Education

Al-Ma’alim Al-Huraa Co.

Stores Su’eraa Area-Al-Kout

Manufacturing & Delivery  Structure

22nd Feb.; 2014 to

 25th Mar.; 2014

44

Ministry of Oil

Al-We’am Tower for Contracting

Export Water Pipe to CPS-3 at Basra.

Manufacturing of Pipe Sleepers

6thApril; 2014 to

22ndJun.; 2014

45

Ministry of Trade

Naba’e Al-Salam Co.

Jurff Al-Nadaf Store-Baghdad

Manufacturing & Delivery of Precast Concrete Structure and Sheds.

28th Jan.; 2014 to

 4th Feb.; 2014

46

Ministry of water

CGC Co.

Hey Sewage Station–Al-Kut Governorate.

Manufacturing, Delivery & Driving of Precast Piles.

4th Jan.; 2014 to

22nd Nov.; 2014

47

Ministry of Health

TERNA CO.

Safwan  Hospital -Basra

Manufacturing, Delivery & Installation of Precast Concrete Fence 3m

30rd Nov.; 2013 to

1st Feb.; 2014

 

 

   I)  Bored & Precast Piles Supply and Installation Projects for 2014

 

SR#

Client

Main Contractor /Co.

Project Name & Location

Performed Work

From / To Year

48

Ministry of Electric

Al-Bena’a Technology Co.

Al-Kahlaa Electric Station

Manufacturing, Fence H=3.5m

19th Feb.; 2014 to

9th Jun.; 2014

 

49

Ministry of Oil

China PP. Co.

EPCC FOR Missan Oil Export Pipeline (MOEP), at FAO.              (BVS 13, BVS 14) and FAO Station.

Manufacturing, delivery and Installation of Precast Piles.

8th Mar.; 2014 to

20th May.; 2014

50

Ministry of Education

Anwar Ali Al-Ghrbi Co.

  Education  Stores-Missan

Manufacturing & Delivery of Precast Concrete Structure and Sheds.

27th Aug.; 2014 to

27th Sept.;2014

51

Ministry of Electric

Al-Amaaq CO.

Electric Station _Al-Dewania & Al-Samawah 

Fence

22nd Oct.; 2014 to

Until Now

52

Ministry of Oil

Al-Hajr Al-Aswad  Co.

Guard Tower-Basra

Manufacturing, delivery and installation Guard Towers H=7.5m

6th Mar.;2012 to

 24th Jan.; 2015

53

Ministry of Oil

Rukn Al-Basra Co.

Gas Al-Janoob Site-Basra

Manufacturing of T-Walls &Jersey Barriers.

27thNov.;2014 to

 17th  Dec. ; 2014

54

British Petroleum Co.

Lamsat  Al-Emar Co.

South Rumaila /U-Culvert Provision Basra

Manufacturing & Delivery of Precast U-Culvert Elements.

24th Jun.; 2014 to

6th Sept.; 2014

 

 

 

Follow Us

 

 


 

 

 
 

 

© 2011 Al-Fayhaa Group. All Rights Reserved.

Powered by LNA